September 2009 - First Floor Panels

2nd September - The second delivery, containing the first floor panels, arrived from Scotframe. As you will see the first floor went up pretty easily. Unfortunately the roof trusses didn't arrive on schedule which was a pain as we only had the crane on hire for 1 day.





Crane arrives and prepares to lift the panels off the lorry




Panels are lifted off the lorry



First floor panels start to be fixed into place




Panels at the front of the first floor are erected




Panels at the rear are erected